The Special Assessment Area (SAA) included 2.5-miles of roadway improvement design to support increased vehicular traffic and pedestrian safety associated with a 2018 opening of Farmington High School. Major components of work included: existing conditions and topographic survey; property deed research; rights-of-way determinations; roadway dedication(s); warranty deeds; easements; utility improvements designs; roadway widening to construct roadways to their full right-of-way widths; grading; drainage; traffic study and signalized intersection design at Glovers Lane and 650 West; Design roadway extension of 1100 West over new Farmington Creek box culvert bridge to eliminate dead-end road and provide improved access to Canyon Creek Elementary School.
Relevant Components: Property Acquisition, ROW Survey, Signal Design, Storm Water Analysis, Utility Upgrade
Farmington City
Farmington, UT