Let's Get Started
Consult a Professional
Client Farmington City
Location Farmington, UT

The Special Assessment Area (SAA) included 2.5-miles of roadway improvement design to support increased vehicular traffic and pedestrian safety associated with a 2018 opening of Farmington High School. Major components of work included: existing conditions and topographic survey; property deed research; rights-of-way determinations; roadway dedication(s); warranty deeds; easements; utility improvements designs; roadway widening to construct roadways to their full right-of-way widths; grading; drainage; traffic study and signalized intersection design at Glovers Lane and 650 West; Design roadway extension of 1100 West over new Farmington Creek box culvert bridge to eliminate dead-end road and provide improved access to Canyon Creek Elementary School.
Relevant Components: Property Acquisition, ROW Survey, Signal Design, Storm Water Analysis, Utility Upgrade

Client

Farmington City

Location

Farmington, UT

Sectors and Services

Put Our Experience to Work for You. View Our Project Portfolio
Planning a Project? Let's Talk