As part of the new 3 MG Zone 3 North Tank design, CRS designed over a mile of new 20-inch waterline to connect the new tank to the existing pressure zones. The project included coordination with UDOT (near Mountain View Corridor), crossings over Kern River Gas, trenchless installation, and right-of-way acquisition. We completed hydraulic evaluations, stakeholder coordination, subsurface utility engineering (SUE), and geotechnical analysis.
City of West Jordan
West Jordan, UT