CRS provided site design for a UTA FrontRunner Station in Clearfield with tight time constraints to meet the construction schedule. Particular attention was paid to coordinating with UDOT, UTA, Rocky Mountain Power, and utilities as early as possible to mitigate risks posed to delaying the schedule. This approach allowed CRS to complete the design within the time frame.
Relevant Components: Met tight bidding schedule, third-party coordination, 70-acres open area planned, 2-miles roadways design