The project is a vital connection in the Logan Canyon Trail system. The Logan River was crossed using a prefabricated steel bridge and the trail crossed under Highway 89. CRS effectively minimized impacts to traffic, wildlife, and vegetation as the on-site construction engineering managers. CRS successfully managed project challenges which included an architectural soil nail wall, intricate placement of a pre-fabricated bridge, and managing construction during a season of fluctuating water flows within the Logan River.
Cache County
Logan, UT