The UDOT Rail project included improving pedestrian access at three different rail crossings. CRS performed the survey, base mapping, and ROW identification for each location of duel-track improvements. At each location, CRS designed new panels with pedestrian crossings. Work included roadway redesign with curb and gutter and sidewalk additions. Additionally, crossing lights and gates were designed at 600 West.