This project included safety improvements at a dual- rail crossing and single rail crossing located approximately 400-feet apart. Safety included lights, gates and signals at each crossing, restriping and a profile adjustment with a mill and overlay design to reduce roughness at the crossings.
CRS coordinated with both UPRR and short line operators during the project. Additional work included survey, base map preparation ROW identification, and utility coordination.