Saratoga Springs desire to move a large portion of their sewer system off of lift stations and onto a new gravity outflow. Required the design and construction of over 5.5-miles of large diameter sewer line including 36, 42, and 48-inch sewer lines adding a new Pashall Flume measuring device. The project also included a pedestrian bridge over the Jordan River.
RELEVANT COMPONENTS
• Alternate Bidding
• Condition Assessment
• Project Management
• Construction Management
• Engineering
• Property and Easement Acquisition
• Conditional Assessment
• Granted Easement Documentation