CRS designed a 4.5 MG pre-stressed, post-tensioned concrete water tank in the Middle Zone Tank Farm. Located next to the Olympic Skating Oval, this high profile project required our team to pay very close attention to aesthetics. Responsibilities included survey and layout, site prep and monitoring of excavation, backfill of the structure, restoration of park property, and oversight of installation of re-bar beds, footing, concrete floors, tank wall structure, tank roofs and structure.
Taylorsville-Bennion Improvement District
Taylorsville, UT